PORTFOLIO
- St-Petersburg, turnkey installation of BRIGGS brewhouse.
- Krasnodar, installation of 11000 can filling line,
- Chernigov, assembling and erecting of 2 CCVs under supervision of HOLVRIEKA,
- St-Petersburg, installation and interpiping of 6 Ziemann CCVs,
- St-Petersburg, installation of KHS 2000 PET line.
- St-Petersburg, installation of Tuchenhagen two systems fermenting unit at tank farm
- Chernigov, asssembling and erecting of 3 CCVs under supervision of HOLVRIEKA
- Saransk, asssembling and erecting of 6 CCVs under supervision of HOLVRIEKA
- St-Petersburg, installation of HUPPMANN brewhouse
- St-Petersburg, installation of cabins manufacturing plant with 200t wood drying chamber
- St-Petersburg, montage and commissioning of BUHLER malt handling eqiupment 50t/hour
- Perm, asssembling and erecting of 7 CCVs under supervision of HOLVRIEKA,
- St-Petersburg, montage and commissioning of ROTOMAN and POLIMAN magazine printing lines
- St-Petersburg, montage and commissioning of ELGA BERKEFELD water treatment unit
- St-Petersburg, montage and commissioning of ECOLAB hygine foam cleaning system
- St-Petersburg, service contract
- Chernigov, asssembling and erecting of 7 CCVs under supervision of HOLVRIEKA
- St-Petersburg, installation of four Tuchenhagen pateurisers at packaging area
- Novgorod, montage and commissioning of KHS line at packaging area
- Perm, asssembling and erecting of 12 CCVs under supervision of HOLVRIEKA
- St-Petersburg, turnkey installation of mini brewery
- St-Petersburg, service contract
- Chernigov, asssembling and erecting of 5 CCVs under supervision of HOLVRIEKA
- St-Petersburg, installation of KHS 110000 fillling line
- Novgorod, montage and commissioning of cold block
- St-Petersburg, installation of SHMIDT SEEGER malt handling equipment
- St-Petersburg, insulation of malt silos cones 890m2
- St-Petersburg, turnkey installation of mini brewery
- St-Petersburg, installation of pipework at Krones 10000 PET fillling line
- St-Petersburg, upgrade of Krones filling line
- Chernigov, asssembling and erecting of 4 CCVs under supervision of HOLVRIEKA
- Perm, asssembling and erecting of 6 CCVs under supervision of HOLVRIEKA
- Uianovsk, asssembling and erecting of 18 CCVs and 12 BBTs under supervision of HOLVRIEKA
- St-Petersburg, installation of 5l cans filling line
- Novgorod, montage and commissioning of BKT vessels, interpiping of WESTFALIA separator room
- St-Petersburg, installation of 3 SCAFCO malt silos
- St-Petersburg, turnkey installation of 80t/month brewery
- St-Petersburg, turnkey installation of 30t/month brewery
- St-Petersburg, turnkey installation of brewery
- St-Petersburg, assembling of injection liquid line
- St-Petersburg, service contract
- St-Petersburg, asembling of 50M3 grain silo
- N.Novgorod, turnkey installation of 6 BBT, 12 CCV, 4 HORAPs under supervision of Ziemann-Bayer GmbH
- St-Petersburg, complete Brewhouse upgrade, installation of Krones filling line
- St-Petersburg, installation of Johnson Diversy cleaning units for all filling lines
- St-Petersburg, turnkey installation of 80t/month brewery
- Vladivostok, insatllation of CIP system
- St-Petersburg, service contract
- St-Petersburg, service contract
- N.Novgorod, installation of drying unit for tank farm
- St-Petersburg, installation of yeast storage
- St-Petersburg, installation of cooling system for yeast propagation
- St-Petersburg, removal of filling line equipment to Kaliningrad site
- St-Petersburg, service contract
- St-Petersburg, installation of HP lines for paint supply for bamper assembling block
- Russia, removal from Tinkoff site and put to operation at Ivanovo site 40 CCVs cold block with CIP station and Yeast storage
- Kommunar, installation of 5 VOITH heating beams
- St-Petersburg, installation of welding and purging gases system for steelwork manufactory
- St-Petersburg, installation of ammonium compressor GRASSO and modernization of air supply system
- Kommunar, installation of lubrication system for the paper roll shafts
- Klin, modernization of pilot plant with upgrade of new filling machinery, dismantling of complete PET line
- Moscow, installation of EGAIS counters of alcohol production at filling area
- Metallostoy, installation of pipes for inert gas supply system
- St-Petersburg, installation of raw spirit storage
- Kommunar, installation of treated water supply system,
- St-Petersburg, dismantling of 26 CCVs, CIP station, CO2 recuperation unit, cooling plant, water treatment block,
- Tver, complete mechanical installation of PAROC stone wool machinery,
- St-Petersburg, assembling of decorating frame for onyx panels at Mariinsky Theatre 3rd scene,
- Balashikha, installation of pipes for inert gas supply system,
- Tashkent, asssembling and erecting of 6 CCVs under supervision of HOLVRIEKA,
- Klin, modernization of tank farm with upgrade of DA water supply
- Ivanovo, instalation of second hand CO2 recuperation unit,
- St-Petersburg, modernization of cosmetic mixing plant, unit of soap production,
- St-Petersburg, assembling and erecting of 5 vessels for storage of cosmetic fat with total volume of 1200 tonns,
- St-Petersburg, service contract
- Kommunar, asembling and installation of 4 ss vessels for paper whitening system,
- Tver, service contract,
- Balashikha, installation of complete PGS system,
- St-Petersburg, service cont
- Georgievsk, installation of baby food manufacturing packaging line BRAMBATI
- Klin, upgrade new pasteurization unit UNITEC
- Тверь, removal and assembling of line Lappennranta -Tver
- Moscow, complete upgrade of metring gas unit lab
- Bryansk, upgrade of high pressure bottles filling block
- Moscow, renovation of liquid gas separation block
- Ivanovо, installtion of can line utitlities
- Angarsk, dismantling of cold block ammonium and CO2 compressors
- St-Petersburg, installation of toothpaste manufacturing unit
- Rostov-on-Don, dismantling of complete tank farm total volume 42 kHl
- Russia, Perm dismantling of PET line KRONES 18000 btl/hour
- Moscow, dismantling of 8 BBTs total volume 8000 Hl
- Krasnoyarsk, dismantling of 8 CCVs total volume 32000 Hl
- Kommunar, complete boiler house renovation
- Kommunar, upgrade of steam injecting units
- St-Petersburg, complete sauce manufacturing unit installation
- Moscow, upgrade of Helium production unit
- Gzel, upgrade of Acetilen production unit
- Angarsk, manufacturing and assembling of SS vessels total 750 м3
- St-Petersburg, manufacturing and installation of soap vessels 100m3
- Moscow, dismantling of Maltery with capacity of 4200tn/year of malt
- Chelyabinsk, dismantling of 20 CCVs Ziemann manufactured
- Chelyabinsk, dismantling of complete water treatment plant
- Georgievsk, complete baby food manufacturing unit renovation
- Moscow, assembling of Hydrogen production unit
- Upgrade of Oxygen production unit
- Dzerginsk, upgrade of high pressure bottles filling block
- St-Petersburg, manufacturing and installation of soap vessels 100 m3
- St-Petersburg, dismantling of complete 60Hl Steineker BH
- Chelyabinsk, dismantling of complete tank farm total volume 100 kHl
- Tver, removal and installation foam glass production line Oulu-Tver
- Russia, Angarsk removal of yeast plant and BBT block
- St-Petersburg, assembling of sauce production unit KROVAC RC-2
- Moscow, Hydrogen unit production upgrade
- Angarsk, manufacturing of main reactor
- St-Petersburg, manufacturing and installation of soap vessels 100 m3
- St-Petersburg, manufacturing and installation of soap cyclones
- Novosibirsk, assembling of Maltery with capacity of 4200tn/year of malt
- Novosibirsk, upgrade brewing block up to 1,2 mHl/year
- St-Petersburg, wine fermenting vessels modernisation
- Kommunar, reconstruction of pulp unit
- Volgsky, removal of blow moulding machine unit
- Georgievsk, upgrade of CIP station for of baby food manufacturing
- Moscow, upgrade of Hidrogen production unit
- Troshkovo, upgrade of Acetilene production unit
- Troshkovo, installation of loading cryogen tankers unit
- Mtsensk, installation of cryogen tankfarm block
- Tver, upgrade old collecting drum unit
- Chelyabinsk, dismantling of 6 CCVs Ziemann manufactured
- N.Novgorod, installation of CCV under supervision of Ziemann GmbH
- N.Novgorod, upgrade in beer production unit
- Ekaterinburg, ugrade of BBT unit
- Russia, Angarsk dismantling of BBT block
- St-Petersburg, spirit store modernisation
- Ivanovo, new line for baby food manufacturing factory
- Moscow, renovation of liquid gas HELIUM panels
- Tolyatti, upgrade of high pressure bottles filling block 300 Bar
- Lipetsk, installation of loading ARGON tankers unit
- Kazan, installation of GEA separator 600 Hl/h
- Tver, manufacturing and erecting of COKE silo 300 m3
- N.Novgorod, upgrade of canning line unit
- Ekaterinburg, manufacturing and installation of service platforms at BBT unit
- St-Petersburg, complete installation of two sauce production blocks
- St-Petersburg, manufacturing and installation of spirit filtration unit
- Ivanovo, installation of chlorine dosing system at baby food manufacturing factory
- Moscow, installation of liquid gas HYDROGEN blocks
- Dzerginsk, upgrade of high pressure bottles filling block
- Lipetsk, installation of loading OXYGEN tankers unit
- Tver, complete upgrade of stonewool waste
- Tver, manufacturing and installation of CUPOLA OVEN
- Naro-Fominsk, installation of energy safe heat exchangers
- St-Petersburg, complete modernisation of six sauce production blocks
- Pskov, manufacturing and installation of food oil storage 50 m3
- Pskov, manufacturing and installation of food additives supply units
- Vyazma, manufacturing and installation of work safety system
- Ivanovo, installation of complete packaging baby food line
- Khabarovsk, upgrade of brewhouse vessels
- Kazan, manufacturing and installation of CIP station
- Moscow, upgrade of 300 m3 store vessel
- Lipetsk, assembling of ARGON supply unit
- Georgievsk, removal of packaging line
- Kommunar, piping upgrade service
- Saint-Petersburg, upgrade of storage unit of raw ingredients
- Saint-Petersburg, complete renovation of candies manufacturing unit
- Pskov, manufacturing and installation of packaging system
- Saint-Petersburg, manufacturing of SS high pressure two walls pipes
- Verkhnaya Khava, complete automation of packaging eqiupment
- Toliatti, complete renovation of liquid gas filing unit
- Efremov, complex maltery renovation
- Kommunar, piping upgrade service
- Dzerginsk, assembling СО2 unit
- Astrakhan, NITROGEN unit complete renovation
- Saint-Petersburg, syrup manufacturing upgrade
- Saint-Petersburg, manufacturing of SS collectors for water treatment factory
- Saint-Petersburg, upgrade of mayonnaise manufacturing unit
- Pskov, manufacturing and installation of safety system at production area
- Saint-Petersburg, installation of brewery eqiupment
- Moscow, complete automation of brewery eqiupment
- Saint-Petersburg, renovation of ingredients store